Vietnamese Tiếng Việt | Wednesday, May 22, 2013 | Advertise with Us
   
Text Size

More Services

Biz Directory

1. Sheraton Nha Trang
    Category: Hotels & Resort
    City: Nha Trang
    Image:
2. Novotel Nha Trang
    Category: Hotels & Resort
    City: Nha Trang
    Image:
3. Artexport Corp.
    Category: Arts and Crafts
    City: Ha Noi
    Image:
4. P.P Trading JSC.
    Category: Printing
    City: Ha Noi
    Image:
5. Hai Agrochem JSC.
    Category: Farming
    City: Ho Chi Minh
    Image:
6. Becamex IDC Corp.
    Category: Civil Engineering
    City: Thu Dau Mot TownBinh Duong Province
    Image:

Potholes found on bridge days after inauguration

Share
(0 votes, average 0 out of 5)

Four rather large potholes at the end of a new bridge in Ho Chi Minh City caused cars to shake when Tuoi Tre tested them out July 14, just days after the platform opened.

Potholes seen on the Rach Chiec Bridge on July 14, 2012, Photo: Tuoi Tre

 

The depressions on Rach Chiec Bridge on Hanoi Highway also risk overturning vehicles.

Ly Ngoc Hung, deputy director of Urban Traffic Management Board No. 2 under the city Department of Transport, said the investors did not know about the damage but promised to examine it immediately.

The investor is the Urban Traffic Management Zone No. 2.

Basic work on the bridge finished five months ahead of schedule, but contractors Thang Long Construction Corporation and Traffic Works Construction Corporation No. 1 are still finalizing the project.

Hung said the corporations are responsible for repairs because they haven’t officially transferred the bridge to the investor.

Rach Chiec has six main and four secondary lanes, with a boat clearance of six meters.

Inaugurated July 10 after 17 months of construction, the bridge cost VND1 trillion (US$48 million) and is meant to ease congestion from Thu Duc District to Districts 2 and 9.

City authorities said the bridge, 735 meters long and 48 meters, should boost economic activity between Ho Chi Minh City and southeastern provinces.

On the same day, work began on the first steel flyover in HCMC at the Thu Duc intersection.

The flyover, which will be 570 meters long, 6 meters wide and have four lanes, will be completed early next year at a cost of about VND227 billion (US$10.9 million).

 

Source: Tuoi Tre

Maybe You Also Interesting :

» Potholes mar stretch of National Highway 1A

 For more than a month now, massive potholes have scarred the National Highway 1A stretch from 621 Junction in Thu Duc District in HCM City to the Dong...

» New highway projects in HCMC already downgraded

A number of highways in Ho Chi Minh City have been built at a cost of hundreds of millions of US dollars, but despite the huge expense, their condition in just...

» Coal conveyor to reduce pollution

Coal trucks drop countless amounts of coal in their wake on route from Mao Khe Mine to Ben Can Port. Local residents have suffered from coal dust and muddy...

Society Latest

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7

Our Latest Posts

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7

Popular News Categories:

- Asia & Asian  |  EU & Russia  |  America & US

- Facts  |  Urban  |  Faculty  |  Environment

- Business  |  Finance  |  Market Health

- Destination  |  Cuisine  |  Arts Music

- Cinema  |  Soccer  |  Sports  |  IT & Internet

Culture & Tourism:

-> About Vietnam  |  Things To Do

-> Destinations  |  Events Calendar

-> Visa Online  |  Flights & Transport

-> Accomodation  |  Tours & Cruise

-> Find more go to Travel.VN...

Login